首页 > Decentralized Systems > Integrated wastewater treatment in Ezhou City, Hubei
  • Integrated wastewater treatment in Ezhou City, Hubei
  • Built in 2015, this integrated  sewage treatment plant has a combined capacity of 600 m3/d and effectively meets the Class A water discharge standards in accordance with GB18918-2002 “urban sewage treatment plant pollutant discharge standard”. High efficiency aeration system reduces the energy consumption of the sewage treatment equipment and ensures stable operation throughout the year.

    Each Bagband is equipped with 3 HiBlow 200 air pumps, 2 on, 1 standby. The average power consumption is 0.12kWh/m3 of sewage treated.

    pic1-1-300x225 pic2-1-300x225